ADD ANYTHING HERE OR JUST REMOVE IT...
ICP Ingenieurgesellschaft mbH ICP Ingenieurgesellschaft mbH
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Our Management
    • Group
    • Special qualifications
    • Committees
    • Memberships
    • Publications
    • ICP Audit Firm
  • Expertise
    • Waste and recycling management
    • International waste management
    • Contaminated Sites
    • Drainage systems
    • Geotechnics
    • Environmental protection and nature conservation
    • Seminars & Further Training
  • SIERA Alliance
  • Seminars
  • Projects
  • Locations
  • Career
  • Blogs
en_GB EN
en_GB EN de_DE DE
ICP Ingenieurgesellschaft mbH
en_GB EN
en_GB EN de_DE DE
Menu
HomeDrainage facilities Holistic rehabilitation of the drainage system at Morgenstern landfill site, Goslar district
Previous product
Umweltverträglichkeitsprüfung Hausmülldeponie „Litzholz“
Environmental impact assessment of the "Litzholz" domestic waste landfill site
Back to products
Next product
BV Rückbau Märkisches Zentrum Berlin
BV Deconstruction Märkisches Zentrum Berlin

Holistic rehabilitation of the drainage system at Morgenstern landfill site, Goslar district

Compare
Add to wishlist
  • Description
Description

Client: Kreiswirtschaftsbetriebe (KWB) Goslar; Own business of the district of Goslar
Mission: Redevelopment concept, planning (LPH 1-9 HOAI), local construction supervision

Boundary conditions

BA I: Dilapidated central shaft of masonry concrete blocks DN 2,500, depth approx. 57 m, considerable slanting/twisting, shaft internals partially collapsed, concrete corrosion, washed-out joints with uncontrolled water inflow, massive deposits, collapsed drainage pipes at shaft bottom.

BA II: Central seepage drainage pipe made of PE with massive damage (deformations, collapses, cracks/shards, deposits), overburden up to 35 m, water discharge severely restricted, cleaning/TV no longer possible for many years.

Morgenstern

Rehabilitation techniques 

1. leachate central shaft BA I

  • Clearing out, securing, exploration, sampling of the existing shaft
  • Dismantling and closing of a ducting shaft, sealing of a foundation penetration
  • GRP inliner rehabilitation using the shaft-in-shaft method
  • Laying drainage pipes in the annular space, graveling the annular space
  • Insertion of new drainage stub pipes using the horizontal drilling method, blind holes at the bottom of the shaft and in further drainage horizons (11÷34 m)
  • Use of special equipment (e.g. drilling rig) and safety equipment (e.g. redundant entry device with full respiratory protection, working scaffold in the shaft up to 45 m height).

2. rehabilitation of the drainage pipe BA II

  • Rehabilitation of the drainage pipeline over a length of 350 m by means of burst lining using the tandem shaft method and shaft-on-shaft method.
  • Renewal of a perimeter dam penetration using the cut-and-cover method (slide-rail shoring)

Versions: 2013-2016
ICP Project Management: 
Dipl.-Ing. (FH) Jörg Kässinger
Editing/ED: Dipl.-Ing. (FH) Jörg Kässinger, Dipl.-Ing. (FH) Wolfgang Edenberger

Detailed presentation of the project in the publication in Müll und Abfall 01/2017

Morgenstern

Just click on the image and view the pdf.

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Rehabilitation of a leachate shaft KG Stockstadt landfill site

Drainage facilities

Business areas

Waste and recycling management
International waste management
Contaminated Sites
Drainage systems
Geotechnics
Environment and nature conservation
Building in the existing fabric
Seminars & Further Training

Contact

ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH
Auf der Breit 11
76227 Karlsruhe
Tel: +49 (0) 721 94477 0
E-mail: icp@icp-ing.de

ICP Ingenieurbüro Prof. Czurda Dr. Günther und Partner GmbH
Fasanenweg 2
04420 Markranstädt
Tel: +49 (0) 34 194 4260
E-mail: ICPLeipzig@t-online.de

ICP Engineers GmbH
Am Tränkwald 27
67688 Rodenbach
Tel: +49 (0) 63 748 05070
E-mail: info@icp-geologen.de

Contact

ICP Ingenieurgesellschaft Dipl.-Geol. Brüll, Prof. Czurda & Partner
Illerstraße 12
87452 Altusried
Tel: +49 (0) 83 739 3517 4
E-mail: icp-geologen@t-online.de

ICP Rhein-Main GmbH
Berner Straße 34 b
60437 Frankfurt
Tel: +49(0) 69 695968 91
E-mail: rhein-main@icp-ing.de

Linkedin
Imprint - Data protection
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Our Management
    • Group
    • Special qualifications
    • Committees
    • Memberships
    • Publications
    • ICP Audit Firm
  • Expertise
    • Waste and recycling management
    • International waste management
    • Contaminated Sites
    • Drainage systems
    • Geotechnics
    • Environmental protection and nature conservation
    • Seminars & Further Training
  • SIERA Alliance
  • Seminars
  • Projects
  • Locations
  • Career
  • Blogs