ADD ANYTHING HERE OR JUST REMOVE IT...
ICP Ingenieurgesellschaft mbH ICP Ingenieurgesellschaft mbH
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Our Management
    • Group
    • Special qualifications
    • Committees
    • Memberships
    • Publications
    • ICP Audit Firm
  • Expertise
    • Waste and recycling management
    • International waste management
    • Contaminated Sites
    • Drainage systems
    • Geotechnics
    • Environmental protection and nature conservation
    • Seminars & Further Training
  • SIERA Alliance
  • Seminars
  • Projects
  • Locations
  • Career
  • Blogs
en_GB EN
en_GB EN de_DE DE
ICP Ingenieurgesellschaft mbH
en_GB EN
en_GB EN de_DE DE
Menu
HomeWaste management Intermediate sealing, Hennau landfill, Neue Halberg-Guss GmbH
Previous product
Oberflächenabdichtung der Deponie „Ittersbach“, Landkreis Karlsruhe
Surface sealing of the "Ittersbach" landfill site, Karlsruhe district
Back to products
Next product
Sanierung Altablagerung „Balger Straße“ Stadt Baden-Baden
Remediation of "Balger Straße" old landfill site City of Baden-Baden

Intermediate sealing, Hennau landfill, Neue Halberg-Guss GmbH

Compare
Add to wishlist
  • Description
Description

Description of the project:

Neue Halberg-Guss GmbH, together with Saint-Gobain PAM Deutschland GmbH & Co. KG operates its own Hennau waste dump for the disposal of its production-specific residues. Due to changed legal requirements resulting from the Landfill Ordinance that came into force on 15 July 2009, a concept for the further residual filling of the Hennau waste rock pile was developed. For this purpose, an intermediate sealing was designed for an area of approx. 6 ha in the eastern hilltop area of the landfill. ICP was commissioned with the approval and implementation planning as well as the awarding of contracts and local construction supervision.
For the creation of the subgrade, first of all relocation and profiling work was necessary. A total of approx. 150,000 m³ of waste was removed and relocated to landfill sections outside the intermediate sealing to create the subgrade. The Hennau dump has neither a geological barrier nor a base sealing. Consequently, the following system was implemented for the intermediate sealing:

  • Subgrade of the intermediate sealing, compaction to EV2 > 60 MN/m²Mineral clay sealing of 50 cm thickness in 2 layers with a coefficient of permeability kf < 5×10-10 m/s as a substitute for the geological barrier. A clay from the Assweiler clay pit was used for this purpose. A corresponding suitability test was able to fulfil the requirements of the quality assurance plan.
  • PE-HD plastic sealing sheet with BAM approval of thickness d ≥ 2.5 mm
  • BAM-approved sand protection sheets with a permissible overfill height of up to 40 m Final backfilling of the stockpile with simultaneous use of a surface filter made of sieved track ballast of 8/32 grain size over the sand protection mat.
  • Surface drainage (d = 30 cm, kf ≥ 10-2 m/s)
  • Filter-stable separating layer

For drainage of the sealed areas, 2/3 perforated pipes with a fluidised bed base made of PE-100 were used. The wall thickness and thus the outer diameter of the pipelines were determined within the framework of a pipe statics to be prepared. The maximum fill height above the pipelines is approx. 35 m.
The sealing surfaces were chosen with a cross slope to the seepage collectors of 3%, 4.5% and 5.5%. Drainage in the area of the sealing surface was provided via a surface drainage layer made of screened concrete rubble or 8/32 grain track ballast. A gravel trench 16/32 with a thickness of twice the outer diameter of the pipeline was installed above the seepage water pipe.
All construction work was carried out over a period of 36 months in 3 construction phases within the planned time frame. The total construction costs of € 3.5 million net were below the cost calculation of the approval planning.

Services performed by ICP:

Execution of the implementation planning, preparation and participation in the award of the construction contract to the most economical bidder, execution of the local construction management and the superstructure management, documentation of the project.

Construction time: 2008-2012

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Surface sealing of the "Ittersbach" landfill site, Karlsruhe district

Waste management

Business areas

Waste and recycling management
International waste management
Contaminated Sites
Drainage systems
Geotechnics
Environment and nature conservation
Building in the existing fabric
Seminars & Further Training

Contact

ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH
Auf der Breit 11
76227 Karlsruhe
Tel: +49 (0) 721 94477 0
E-mail: icp@icp-ing.de

ICP Ingenieurbüro Prof. Czurda Dr. Günther und Partner GmbH
Fasanenweg 2
04420 Markranstädt
Tel: +49 (0) 34 194 4260
E-mail: ICPLeipzig@t-online.de

ICP Engineers GmbH
Am Tränkwald 27
67688 Rodenbach
Tel: +49 (0) 63 748 05070
E-mail: info@icp-geologen.de

Contact

ICP Ingenieurgesellschaft Dipl.-Geol. Brüll, Prof. Czurda & Partner
Illerstraße 12
87452 Altusried
Tel: +49 (0) 83 739 3517 4
E-mail: icp-geologen@t-online.de

ICP Rhein-Main GmbH
Berner Straße 34 b
60437 Frankfurt
Tel: +49(0) 69 695968 91
E-mail: rhein-main@icp-ing.de

Linkedin
Imprint - Data protection
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Our Management
    • Group
    • Special qualifications
    • Committees
    • Memberships
    • Publications
    • ICP Audit Firm
  • Expertise
    • Waste and recycling management
    • International waste management
    • Contaminated Sites
    • Drainage systems
    • Geotechnics
    • Environmental protection and nature conservation
    • Seminars & Further Training
  • SIERA Alliance
  • Seminars
  • Projects
  • Locations
  • Career
  • Blogs