ADD ANYTHING HERE OR JUST REMOVE IT...
ICP Ingenieurgesellschaft mbH ICP Ingenieurgesellschaft mbH
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Our Management
    • Group
    • Special qualifications
    • Committees
    • Memberships
    • Publications
    • ICP Audit Firm
  • Expertise
    • Waste and recycling management
    • International waste management
    • Contaminated Sites
    • Drainage systems
    • Geotechnics
    • Environmental protection and nature conservation
    • Seminars & Further Training
  • SIERA Alliance
  • Seminars
  • Projects
  • Locations
  • Career
  • Blogs
en_GB EN
en_GB EN de_DE DE
ICP Ingenieurgesellschaft mbH
en_GB EN
en_GB EN de_DE DE
Menu
HomeContaminated Sites Remediation of "Balger Straße" old landfill site City of Baden-Baden
Previous product
Zwischenabdichtung, Deponie Hennau, Neue Halberg-Guss GmbH
Intermediate sealing, Hennau landfill, Neue Halberg-Guss GmbH
Back to products
Next product
Sanierung eines Sickerwasserschachtes Mülldeponie KG Stockstadt
Rehabilitation of a leachate shaft KG Stockstadt landfill site

Remediation of "Balger Straße" old landfill site City of Baden-Baden

Compare
Add to wishlist
  • Description
Description

Description of the project:

The old landfill "Balger Straße" was created as a former clay pit of a brickyard and subsequently used by the city of Baden-Baden as a landfill for household waste. Waste: Household waste, commercial waste, building rubble, road debris, excavated earth, sewage sludge
Characteristic pollutants in the groundwater downstream: CHCs, PAHs, benzene, cyanide, ammonium, as well as gas emissions in the immediate vicinity (road substructure, shafts, sewers). After a detailed investigation, it was decided to remediate the contaminated site by means of a cut-off wall.

Start / Completion:
2003/2012 (main measure, cut-off wall construction 2008, monitoring phase still ongoing until 2012)

Services performed by ICP:

ICP was first commissioned to carry out the I/E investigation (remediation investigation E3-4) in accordance with the Baden-Württemberg Contaminated Sites Manual. For this purpose, after the planning of the further investigation measures by ICP, tender documents for the construction of additional groundwater observation wells as well as other measures (pumping and backfilling tests, taking soil samples (for soil mechanical / physical investigations) as well as groundwater samples (for chemical analyses) were prepared. The boreholes were monitored and the investigation results were evaluated together with the findings available so far.
After the possibility of a cut-off wall around the old deposit was shortlisted as a recommended measure, ICP carried out groundwater modelling and then simulated the effects of a cut-off wall. After the sealing of the old deposit by means of a cut-off wall had been determined as a safety measure, the hydraulic measures required for this were described by ICP. After approval of the cut-off wall enclosure with dewatering and leachate treatment (pump and treat), ICP was commissioned with the planning and local construction supervision of the measure.

Business areas

Waste and recycling management
International waste management
Contaminated Sites
Drainage systems
Geotechnics
Environment and nature conservation
Building in the existing fabric
Seminars & Further Training

Contact

ICP Ingenieurgesellschaft Prof. Czurda und Partner mbH
Auf der Breit 11
76227 Karlsruhe
Tel: +49 (0) 721 94477 0
E-mail: icp@icp-ing.de

ICP Ingenieurbüro Prof. Czurda Dr. Günther und Partner GmbH
Fasanenweg 2
04420 Markranstädt
Tel: +49 (0) 34 194 4260
E-mail: ICPLeipzig@t-online.de

ICP Engineers GmbH
Am Tränkwald 27
67688 Rodenbach
Tel: +49 (0) 63 748 05070
E-mail: info@icp-geologen.de

Contact

ICP Ingenieurgesellschaft Dipl.-Geol. Brüll, Prof. Czurda & Partner
Illerstraße 12
87452 Altusried
Tel: +49 (0) 83 739 3517 4
E-mail: icp-geologen@t-online.de

ICP Rhein-Main GmbH
Berner Straße 34 b
60437 Frankfurt
Tel: +49(0) 69 695968 91
E-mail: rhein-main@icp-ing.de

Linkedin
Imprint - Data protection
  • Home
  • ABOUT US
    • Philosophy
    • History
    • Our Management
    • Group
    • Special qualifications
    • Committees
    • Memberships
    • Publications
    • ICP Audit Firm
  • Expertise
    • Waste and recycling management
    • International waste management
    • Contaminated Sites
    • Drainage systems
    • Geotechnics
    • Environmental protection and nature conservation
    • Seminars & Further Training
  • SIERA Alliance
  • Seminars
  • Projects
  • Locations
  • Career
  • Blogs