{"id":22268,"date":"2023-07-10T05:34:50","date_gmt":"2023-07-10T05:34:50","guid":{"rendered":"https:\/\/icp-staging-site-new-wordpress.rz.mup-digital.com\/?post_type=projects&#038;p=22268"},"modified":"2023-09-06T11:25:10","modified_gmt":"2023-09-06T11:25:10","slug":"sanierung-eines-sickerwasserschachtes-muelldeponie-kg-stockstadt","status":"publish","type":"projects","link":"https:\/\/icp-ing.de\/en\/projects\/sanierung-eines-sickerwasserschachtes-muelldeponie-kg-stockstadt\/","title":{"rendered":"Rehabilitation of a leachate shaft KG Stockstadt landfill site"},"content":{"rendered":"<p><strong>Client:&nbsp;<\/strong>KG Stockstadt landfill site, Seligenst\u00e4dter Str., 63811 Stockstadt<\/p>\n\n\n\n<p><strong>Project sponsor:&nbsp;<\/strong>LRA Aschaffenburg, Waste Management, Bayernstr. 18, 63739 Aschaffenburg<\/p>\n\n\n\n<p><strong>Mission:&nbsp;<\/strong>Work phases 3-9 in accordance with Part VII HOAI, local construction supervision<\/p>\n\n\n\n<p><strong>Boundary conditions:&nbsp;<\/strong>Waste cover up to 20 m, existing shaft dilapidated<\/p>\n\n\n\n<p><strong>Remediation technology:<\/strong><br>Shotcrete construction pit with a diameter of 5.50 m, depth approx. 20 m, dismantling of the existing shaft, removal of the new reinforced concrete shaft DN 1,800 as a drainage shaft with lining\/sheathing made of polypropylene, installation of flushing lances and ring drainage.<\/p>\n\n\n\n<p><strong>Construction time, execution period:&nbsp;<\/strong>approx. 4 months, 2011<\/p>\n\n\n\n<p><strong>Project management:<\/strong> Dipl.-Ing. (FH) J\u00f6rg K\u00e4ssinger<br>Technical support \/ local construction supervision: Dipl.-Ing. (FH) Wolfgang Edenberger, ICP Urbach<\/p>","protected":false},"author":28,"featured_media":0,"parent":0,"template":"","company-group":[74],"project-category":[68],"class_list":["post-22268","projects","type-projects","status-publish","hentry","company-group-icp-ingenieurgesellschaft","project-category-entwaesserungseinrichtungen"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/projects\/22268","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/users\/28"}],"wp:attachment":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/media?parent=22268"}],"wp:term":[{"taxonomy":"company-group","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/company-group?post=22268"},{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/project-category?post=22268"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}