{"id":22264,"date":"2023-07-08T22:13:11","date_gmt":"2023-07-08T22:13:11","guid":{"rendered":"https:\/\/icp-staging-site-new-wordpress.rz.mup-digital.com\/?post_type=projects&#038;p=22264"},"modified":"2023-09-06T11:26:09","modified_gmt":"2023-09-06T11:26:09","slug":"umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz","status":"publish","type":"projects","link":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/","title":{"rendered":"Environmental impact assessment of the \"Litzholz\" domestic waste landfill site"},"content":{"rendered":"<h2 class=\"wp-block-heading\"><strong>DESCRIPTION OF THE PROJECT:<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The household waste landfill \"Litzholz\" was to be technically improved in the existing areas and generously expanded. The new planning of the landfill (including the extension) covered about 25 ha. The future expansion area is to be used for the deposit of ashes and slags from waste incineration.<br>In the existing areas, the landfill has a landfill base with mineral sealing and partly with combination sealing. The existing landfill section is degassed. The collected leachate will be treated. The other landfill sections are to receive a combination seal. Furthermore, a surface sealing (also combination sealing) is planned for the entire landfill.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Completion:&nbsp;<\/strong>October 1995<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Services performed by ICP:<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">ICP carried out the environmental impact assessment (EIA) for the measures described above. The EIA comprised both an inventory of environmental impacts and a forecast of future impacts on water, soil, air, fauna, flora and humans due to the planned landfill expansion. For this purpose, geological and hydrogeological investigations were first carried out. Furthermore, a soil survey was carried out and dust emissions in the vicinity of the landfill were determined.<br>The EIA described the expected impacts of the landfill on the environment and the measures to be taken to avoid, reduce or compensate for these impacts. For this purpose, the permeability of the subsoil was determined and various dispersion calculations were made.<br>The EIA considered landfill gas and leachate emissions, odours, noise and dust.<\/p>","protected":false},"author":28,"featured_media":0,"parent":0,"template":"","company-group":[74],"project-category":[69],"class_list":["post-22264","projects","type-projects","status-publish","hentry","company-group-icp-ingenieurgesellschaft","project-category-umweltplanung"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"BESCHREIBUNG DES PROJEKTS: Die Hausm\u00fclldeponie \u201eLitzholz\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\u00dfz\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\u00dflich der Erweiterung) etwa 25 ha. Der zuk\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"aatik\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"ICP Ingenieurgesellschaft mbH - Engineering For Better Tomorrow\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c - ICP Ingenieurgesellschaft mbH\" \/>\n\t\t<meta property=\"og:description\" content=\"BESCHREIBUNG DES PROJEKTS: Die Hausm\u00fclldeponie \u201eLitzholz\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\u00dfz\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\u00dflich der Erweiterung) etwa 25 ha. Der zuk\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2023-07-08T22:13:11+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2023-09-06T11:26:09+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c - ICP Ingenieurgesellschaft mbH\" \/>\n\t\t<meta name=\"twitter:description\" content=\"BESCHREIBUNG DES PROJEKTS: Die Hausm\u00fclldeponie \u201eLitzholz\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\u00dfz\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\u00dflich der Erweiterung) etwa 25 ha. Der zuk\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/icp-ing.de\\\/en\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/#listItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/company-group\\\/icp-ingenieurgesellschaft\\\/#listItem\",\"name\":\"ICP Ingenieurgesellschaft\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/company-group\\\/icp-ingenieurgesellschaft\\\/#listItem\",\"position\":3,\"name\":\"ICP Ingenieurgesellschaft\",\"item\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/company-group\\\/icp-ingenieurgesellschaft\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/#listItem\",\"name\":\"Umweltvertr\\u00e4glichkeitspr\\u00fcfung Hausm\\u00fclldeponie \\u201eLitzholz\\u201c\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/#listItem\",\"name\":\"Projects\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/#listItem\",\"position\":4,\"name\":\"Umweltvertr\\u00e4glichkeitspr\\u00fcfung Hausm\\u00fclldeponie \\u201eLitzholz\\u201c\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/company-group\\\/icp-ingenieurgesellschaft\\\/#listItem\",\"name\":\"ICP Ingenieurgesellschaft\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/#organization\",\"name\":\"ICP Ingenieurgesellschaft mbH\",\"description\":\"Engineering For Better Tomorrow\",\"url\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/author\\\/aatik\\\/#author\",\"url\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/author\\\/aatik\\\/\",\"name\":\"aatik\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9c9fac5516ac6c0a8feb9d3a436eb824fba9e8658e68ee554c2532c80aaa5803?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"aatik\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/#webpage\",\"url\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/\",\"name\":\"Umweltvertr\\u00e4glichkeitspr\\u00fcfung Hausm\\u00fclldeponie \\u201eLitzholz\\u201c - ICP Ingenieurgesellschaft mbH\",\"description\":\"BESCHREIBUNG DES PROJEKTS: Die Hausm\\u00fclldeponie \\u201eLitzholz\\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\\u00dfz\\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\\u00dflich der Erweiterung) etwa 25 ha. Der zuk\\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/projects\\\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/author\\\/aatik\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/author\\\/aatik\\\/#author\"},\"datePublished\":\"2023-07-08T22:13:11+00:00\",\"dateModified\":\"2023-09-06T11:26:09+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/\",\"name\":\"ICP Ingenieurgesellschaft mbH\",\"description\":\"Engineering For Better Tomorrow\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/icp-ing.de\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Environmental Impact Assessment for the \u201eLitzholz\u201c Household Waste Landfill Site \u2013 ICP Ingenieurgesellschaft mbH","description":"PROJECT DESCRIPTION: The \u201eLitzholz\u201c municipal waste landfill site was to undergo technical upgrades and a major expansion in its existing areas. The redesign of the landfill site (including the extension) covered approximately 25 ha. The future extension area is to be used for the disposal of ash and slag from waste incineration. In its existing areas, the landfill site has a landfill base with a mineral seal and","canonical_url":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en#listItem","position":1,"name":"Home","item":"https:\/\/icp-ing.de\/en","nextItem":{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/projects\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/projects\/#listItem","position":2,"name":"Projects","item":"https:\/\/icp-ing.de\/en\/projects\/","nextItem":{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/company-group\/icp-ingenieurgesellschaft\/#listItem","name":"ICP Ingenieurgesellschaft"},"previousItem":{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/company-group\/icp-ingenieurgesellschaft\/#listItem","position":3,"name":"ICP Ingenieurgesellschaft","item":"https:\/\/icp-ing.de\/en\/company-group\/icp-ingenieurgesellschaft\/","nextItem":{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/#listItem","name":"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c"},"previousItem":{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/projects\/#listItem","name":"Projects"}},{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/#listItem","position":4,"name":"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c","previousItem":{"@type":"ListItem","@id":"https:\/\/icp-ing.de\/en\/company-group\/icp-ingenieurgesellschaft\/#listItem","name":"ICP Ingenieurgesellschaft"}}]},{"@type":"Organization","@id":"https:\/\/icp-ing.de\/en\/#organization","name":"ICP Ingenieurgesellschaft mbH","description":"Engineering For Better Tomorrow","url":"https:\/\/icp-ing.de\/en\/"},{"@type":"Person","@id":"https:\/\/icp-ing.de\/en\/author\/aatik\/#author","url":"https:\/\/icp-ing.de\/en\/author\/aatik\/","name":"aatik","image":{"@type":"ImageObject","@id":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/9c9fac5516ac6c0a8feb9d3a436eb824fba9e8658e68ee554c2532c80aaa5803?s=96&d=mm&r=g","width":96,"height":96,"caption":"aatik"}},{"@type":"WebPage","@id":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/#webpage","url":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/","name":"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c - ICP Ingenieurgesellschaft mbH","description":"BESCHREIBUNG DES PROJEKTS: Die Hausm\u00fclldeponie \u201eLitzholz\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\u00dfz\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\u00dflich der Erweiterung) etwa 25 ha. Der zuk\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/icp-ing.de\/en\/#website"},"breadcrumb":{"@id":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/#breadcrumblist"},"author":{"@id":"https:\/\/icp-ing.de\/en\/author\/aatik\/#author"},"creator":{"@id":"https:\/\/icp-ing.de\/en\/author\/aatik\/#author"},"datePublished":"2023-07-08T22:13:11+00:00","dateModified":"2023-09-06T11:26:09+00:00"},{"@type":"WebSite","@id":"https:\/\/icp-ing.de\/en\/#website","url":"https:\/\/icp-ing.de\/en\/","name":"ICP Ingenieurgesellschaft mbH","description":"Engineering For Better Tomorrow","inLanguage":"en-GB","publisher":{"@id":"https:\/\/icp-ing.de\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"ICP Ingenieurgesellschaft mbH - Engineering For Better Tomorrow","og:type":"article","og:title":"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c - ICP Ingenieurgesellschaft mbH","og:description":"BESCHREIBUNG DES PROJEKTS: Die Hausm\u00fclldeponie \u201eLitzholz\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\u00dfz\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\u00dflich der Erweiterung) etwa 25 ha. Der zuk\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und","og:url":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/","article:published_time":"2023-07-08T22:13:11+00:00","article:modified_time":"2023-09-06T11:26:09+00:00","twitter:card":"summary_large_image","twitter:title":"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c - ICP Ingenieurgesellschaft mbH","twitter:description":"BESCHREIBUNG DES PROJEKTS: Die Hausm\u00fclldeponie \u201eLitzholz\u201c sollte in den bestehenden Bereichen technisch verbessert und gro\u00dfz\u00fcgig erweitert werden. Die Neuplanung der Deponie umfasste (einschlie\u00dflich der Erweiterung) etwa 25 ha. Der zuk\u00fcnftige Erweiterungsbereich soll zur Ablagerung von Aschen und Schlacken aus der M\u00fcllverbrennung genutzt werden.Die Deponie hat in den bestehenden Bereichen eine Deponiesohle mit mineralischer Dichtung und"},"aioseo_meta_data":{"post_id":"22264","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_url":null,"og_image_width":null,"og_image_height":null,"og_image_custom_url":null,"og_image_custom_fields":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_url":null,"twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_title":null,"twitter_description":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"schema_type":"default","schema_type_options":null,"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"breadcrumb_settings":null,"limit_modified_date":false,"ai":null,"created":"2024-09-10 09:18:36","updated":"2025-07-01 21:23:36","seo_analyzer_scan_date":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/icp-ing.de\/en\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/icp-ing.de\/en\/projects\/\" title=\"Projects\">Projects<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/icp-ing.de\/en\/company-group\/icp-ingenieurgesellschaft\/\" title=\"ICP Ingenieurgesellschaft\">ICP Ingenieurgesellschaft<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tUmweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/icp-ing.de\/en"},{"label":"Projects","link":"https:\/\/icp-ing.de\/en\/projects\/"},{"label":"ICP Ingenieurgesellschaft","link":"https:\/\/icp-ing.de\/en\/company-group\/icp-ingenieurgesellschaft\/"},{"label":"Umweltvertr\u00e4glichkeitspr\u00fcfung Hausm\u00fclldeponie \u201eLitzholz\u201c","link":"https:\/\/icp-ing.de\/en\/projects\/umweltvertraeglichkeitspruefung-hausmuelldeponie-litzholz\/"}],"_links":{"self":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/projects\/22264","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/users\/28"}],"wp:attachment":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/media?parent=22264"}],"wp:term":[{"taxonomy":"company-group","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/company-group?post=22264"},{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/project-category?post=22264"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}