{"id":21196,"date":"2023-06-20T00:00:00","date_gmt":"2023-06-20T00:00:00","guid":{"rendered":"https:\/\/ibgw-leipzig.de\/?post_type=projects&amp;p=21196"},"modified":"2023-06-20T00:00:00","modified_gmt":"2023-06-20T00:00:00","slug":"konversion-ehem-bw-krankenhaus-rostrup-bad-zwischenahn","status":"publish","type":"projects","link":"https:\/\/icp-ing.de\/en\/projects\/konversion-ehem-bw-krankenhaus-rostrup-bad-zwischenahn\/","title":{"rendered":"Conversion of the former BW Hospital Rostrup, Bad Zwischenahn"},"content":{"rendered":"<p><strong>Period:&nbsp;<\/strong>Since 2009<\/p>\n\n\n\n<p><strong>Field of activity:&nbsp;<\/strong>Explosive ordnance clearance, construction site construction, deconstruction, contaminated sites, unsealing,<\/p>\n\n\n\n<p>Soil and waste management (material flows),<\/p>\n\n\n\n<p><strong>Planning services in accordance with federal working aids<\/strong><\/p>\n\n\n\n<p><strong>Scope of services:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Creation of a historical-genetic reconstruction (HgR)<\/li>\n<\/ul>\n\n\n\n<p>Explosive ordnance and contaminated sites<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Preparation of a cost estimate for the implementation of phase B\/C -<\/li>\n\n\n\n<li>Sounding and clearing concept<\/li>\n\n\n\n<li>Preparation of the sounding and clearance concept Deconstruction planning incl. pollutant register<\/li>\n\n\n\n<li>Explosive ordnance detection and clearance planning<\/li>\n\n\n\n<li>Investigation\/hazard assessment in the sense of BBodSchG<\/li>\n\n\n\n<li>Planning soil remediation<\/li>\n\n\n\n<li>Soil and waste management planning<\/li>\n\n\n\n<li>Preparing investigations in the LSG<\/li>\n\n\n\n<li>Conducting discussions with authorities<\/li>\n\n\n\n<li>Support of the AG in renegotiations with the BImA<\/li>\n\n\n\n<li>Preparation of tender documents and participation in<\/li>\n\n\n\n<li>Bidder talks<\/li>\n\n\n\n<li>Supervision of the execution, coordination of the individual trades,<\/li>\n\n\n\n<li>Cost controlling, sampling and analytics<\/li>\n\n\n\n<li>Implementation of funding management (N-Bank -&gt; EFRE)<\/li>\n<\/ul>\n\n\n\n<p><strong>The above services cover the AHO\/HOAI planning areas in all phases.<\/strong><\/p>","protected":false},"author":3,"featured_media":0,"parent":0,"template":"","company-group":[],"project-category":[79],"class_list":["post-21196","projects","type-projects","status-publish","hentry","project-category-boden"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/projects\/21196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/users\/3"}],"wp:attachment":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/media?parent=21196"}],"wp:term":[{"taxonomy":"company-group","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/company-group?post=21196"},{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/project-category?post=21196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}