{"id":17948,"date":"2022-11-01T07:49:47","date_gmt":"2022-11-01T07:49:47","guid":{"rendered":"https:\/\/icp-staging-site-new-wordpress.rz.mup-digital.com\/?post_type=product&#038;p=17948"},"modified":"2023-03-10T09:11:57","modified_gmt":"2023-03-10T09:11:57","slug":"sanierung-eines-sickerwasserschachtes-mulldeponie-kg-stockstadt","status":"publish","type":"product","link":"https:\/\/icp-ing.de\/en\/product\/sanierung-eines-sickerwasserschachtes-mulldeponie-kg-stockstadt\/","title":{"rendered":"Rehabilitation of a leachate shaft KG Stockstadt landfill site"},"content":{"rendered":"<p><strong>Client:\u00a0<\/strong>KG Stockstadt landfill site, Seligenst\u00e4dter Str., 63811 Stockstadt<\/p>\n<p><strong>Project sponsor:\u00a0<\/strong>LRA Aschaffenburg, Waste Management, Bayernstr. 18, 63739 Aschaffenburg<\/p>\n<p><strong>Mission:\u00a0<\/strong>Work phases 3-9 in accordance with Part VII HOAI, local construction supervision<\/p>\n<p><strong>Boundary conditions:\u00a0<\/strong>Waste cover up to 20 m, existing shaft dilapidated<\/p>\n<p><strong>Remediation technology:<\/strong><br \/>\nShotcrete construction pit with a diameter of 5.50 m, depth approx. 20 m, dismantling of the existing shaft, removal of the new reinforced concrete shaft DN 1,800 as a drainage shaft with lining\/sheathing made of polypropylene, installation of flushing lances and ring drainage.<\/p>\n<p><strong>Construction time, execution period:\u00a0<\/strong>approx. 4 months, 2011<\/p>\n<p><strong>Project management:<\/strong> Dipl.-Ing. (FH) J\u00f6rg K\u00e4ssinger<br \/>\nTechnical support \/ local construction supervision: Dipl.-Ing. (FH) Wolfgang Edenberger, ICP Urbach<\/p>","protected":false},"excerpt":{"rendered":"<p>Client: M\u00fclldeponie KG Stockstadt, Seligenst\u00e4dter Str., 63811 Stockstadt Project executing agency: LRA Aschaffenburg, Abfallwirtschaft, Bayernstr. 18, 63739 Aschaffenburg Contract: Work phases 3-9 based on Part VII<\/p>","protected":false},"featured_media":17949,"template":"","meta":{"inline_featured_image":false},"product_brand":[],"product_cat":[52],"product_tag":[],"class_list":{"0":"post-17948","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-entwasserungseinrichtungen","8":"first","9":"instock","10":"shipping-taxable","11":"product-type-simple"},"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/product\/17948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/media\/17949"}],"wp:attachment":[{"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/media?parent=17948"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/product_brand?post=17948"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/product_cat?post=17948"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/icp-ing.de\/en\/wp-json\/wp\/v2\/product_tag?post=17948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}